Projects

Oil tanks and oil derivatives tanks

Fixed steel roof tanks

  • Object name: Oil base "Nikoljsko"
  • Investor: Transneft
  • Place: Nikoljsko, Russian Federation
  • Period of construction: September 2006.
  • Characteristics:

    Tank repair-capacity of 10000 m³.

  • Object name: Wastewater treatment plant
  • Investor: Transneft
  • Place: Primorsk, Russian Federation
  • Period of construction: October - December 2005.
  • Capacity: 5000 m³
  • Diamond: 23 m
  • Height: 12 m
  • Characteristics:

    Tank is part of the wastewater treatment plant, from the process of flushing tankers for the oil transportation. In the cylindrical reservoir there is a conical leak in which wastewater is poured.

  • Object name: Oil base "Sesharis" on the Black Sea
  • Investor: Transneft
  • Place: Novosibirsk, Russian Federation
  • Period of construction: August 2006.
  • Capacity: 2000 m³
  • Diamond: 21 m
  • Height: 12 m
  • Characteristics:

    Water storage tank for the fire protection system.

  • Object name: Reservoir G1 Novi Sad
  • Investor: NIS A.D.
  • Place: Novi Sad, Serbia
  • Period of construction: February - March 2009.
  • Capacity: 3000 m³
  • Diamond: 19 m
  • Height: 10,5 m
  • Characteristics:

    Tank for gasoline storage.

Tanks with floating roof

  • Object name: Oil base "Grusevaja"
  • Investor: Transneft
  • Place: Novosibirsk, Russian Federation
  • Period of construction: February - June 2004.
  • Capacity: 50000 m³
  • Diamond: 61 m
  • Height: 18 m
  • Object name: Oil base "Nikoljsko"
  • Investor: Transneft, oil pipeline COMPANY
  • Place: Nikoljsko, Russian Federation
  • Period of construction: October - December 2005.
  • Capacity: 50000 m³
  • Diamond: 61 m
  • Height: 18 m
  • Object name: "Primorsk"
  • Investor: Transneft
  • Place: Primorsk, Russian Federation
  • Period of construction: December 2004. - April 2005.
  • Capacity: 50000 m³
  • Diamond: 61 m
  • Height: 18 m
  • Characteristics:

    Two tanks of mentioned dimensions have been created.

  • Object name: Petroleum base "Samara"
  • Investor: Transneft
  • Place: Samara, Russian Federation
  • Period of construction: February - April 2006.
  • Capacity: 50000 m³
  • Diamond: 61 m
  • Height: 18 m

Tanks with aluminum roof

  • Object name: Oil base "Sesharis" on the Black Sea
  • Investor: Transneft
  • Place: Novosibirsk, Russian Federation
  • Period of construction: July - September 2006.
  • Characteristics:

    Production of two tanks with a capacity of 10000 m³.

Rolled tanks

  • Object name: Wastewater treatment plant
  • Investor: Transneft
  • Place: Primorsk, Russian Federation
  • Period of construction: October - December 2005.
  • Capacity: 200 m³
  • Characteristics:

    Two tanks within the wastewater treatment plant from the process of flushing oil tankers.

Underground tanks

  • Object name: Wastewater treatment plant
  • Investor: Transneft
  • Place: Primorsk, Russian Federation
  • Period of construction: October - December 2006.
  • Characteristics:

    Underground tanks with a capacity of 50 to 200 m3 for receiving sewage.

Pipelines and pumping houses

  • Object name: Oil base "Nikoljsko"
  • Investor: Transneft, oil pipeline COMPANY
  • Place: Nikoljsko, Russian Federation
  • Period of construction: December 2006.
  • Pipe direction: DN80 do DN325.
  • Characteristics:

    Removal of a tank capacity of 10000 m³.

  • Note:

    Installation of copper dispenser with accompanying measuring and control valves. The aggressive fire protection properties required the pipeline to be stainless steel, inert on foam.

  • Object name: "Nikoljsko"
  • Investor: Transneft, oil pipeline COMPANY
  • Place: Nikoljsko, Russian Federation
  • Period of construction: December 2006.
  • Object name: Oil Base "Nevsky"
  • Investor: Transneft, oil pipeline COMPANY
  • Place: St. Petersburg, Russian Federation
  • Period of construction: October - December 2006.
  • Characteristics:

    Installation of a pipeline for the transport of oil.

  • Object name: "Skavrodino"
  • Investor: Transneft
  • Place: Skavrodino, Russian Federation
  • Period of construction: July - August 2009.
  • Object name: Petroleum base "Samara 2"
  • Investor: Transneft
  • Place: Samara, Russian Federation
  • Period of construction: February - May 2006.
  • Characteristics:

    Connecting the tank to the main pipeline.

Structures in construction

  • Object name: "Delta City" shopping center
  • Investor: Delta
  • Place: Belgrade, Serbia
  • Period of construction: March - July 2007.
  • Characteristics:

    Design and installation of skylights and grids for cinemas. We were hair a subcontractor.

  • Object name: Warehouse Hall
  • Investor: Private person
  • Place: Belgrade, Serbia
  • Period of construction: 2007.
  • Characteristics:

    Hall range 20 m.

  • Object name: Design for billboards
  • Investor: Elitas
  • Place: Belgrade, Serbia
  • Period of construction: July 2008.
  • Characteristics:

    Billboard installation on the building roof top, length 15 m, height 4 m.

  • Object name: Production hall
  • Investor: Private person
  • Place: Belgrade, Serbia
  • Period of construction: May 2008.
  • Characteristics:

    Hall range 15 m.

  • Object name: Oil Base "Nevsky - Crossroads"
  • Investor: Transneft
  • Place: St. Petersburg, Russian Federation
  • Period of construction: October - December 2006.
  • Characteristics:

    Oil manipulative pump station.

  • Object name: Wastewater treatment plant
  • Investor: Transneft
  • Place: Primorsk, Russian Federation
  • Period of construction: October - December 2005.
  • Object name: Wastewater treatment plant
  • Investor: Transneft
  • Place: Primorsk, Russian Federation
  • Period of construction: October - December 2005.

Constructions in telecommunications

Mobile masts

  • Object name: Oil base "Nikoljsko"
  • Investor: Transneft, oil pipeline COMPANY
  • Place: Nikoljsko, Russian Federation
  • Period of construction: December 2006.
  • Characteristics:

    Creation and installation of seven lightning masts with a height of 40m.

  • Object name: Petroleum Base "Primorsk"
  • Investor: Transneft
  • Place: Primorsk, Russian Federation
  • Period of construction: February - May 2005.
  • Characteristics:

    15 antenna 45 m height made up by welding and reflector masts 25 m height.

  • Object name: Petroleum base "Samara 2"
  • Investor: Transneft
  • Place: Samara, Russian Federation
  • Period of construction: May - August 2006.
  • Characteristics:

    The masts are assembled with screws.

Roof and wall antennas support

  • Object name: Antenna for mobile telephony
  • Investor: Konsing
  • Place: Many locations, Serbia
  • Period of construction: Construction period: 2008, 2009
  • Characteristics:

    Production of hot-dip galvanized construction for antennas installation. We built structure for 270 objects.

Thermo-technical installations

  • Object name: Oil base "Skavarodino"
  • Investor: Transneft
  • Place: Skavrodino, Russian Federation
  • Period of construction: June - August 2009.
  • Characteristics:

    Complete heating system, water supply and sewage in oil base.

  • Object name: Market Center "Volgograd"
  • Investor: Yugos
  • Place: Volgograd, Russian Federation
  • Period of construction: June - November 2008.
  • Characteristics:

    Complete system for air conditioning and heating.

Service activities

  • Object name: Belgrade Arena
  • Investor: Belgrade Arena
  • Place: Belgrade, Serbia
  • Period of construction: 2008, 2009.
  • Description:

    Telescopic stands remodel, removing and installing the east stand for the needs of "Eurosong", repair of broken chairs after sports events.